Four laning of existing 2-lane stretch from Govindpur (MH/TG Border) (Design Km 32.910) to Rajura (Design Km 89.090) {Design Length – 56.180 Km} section of NH-353B in the State of Maharashtra on Hybrid Annuity Mode under NH(O)
SPV Incorporated on: 20.04.2022
GRIL equity interest control in SPV: 100%
Total Length of the Project: 56.180 km
Bid Project Cost: 907.00 Cr.
Date of LoA: 30.03.2022
Agreement signed on: 17.05.2022